chantier construction hors site - BAUDET
Cathedral Road Derby - BAUDET Prefabricated Bathrooms

Cathedral Road - Derby

Cathedral Road - The Croft, Derby

BAUDET manufactured and delivered 348 prefabricated bathroom pods for The Croft student residence on Cathedral Road in Derby. Thanks to our expertise in prefabricated bathroom solutions and off-site construction, we ensured consistent quality, fast installation, and smooth coordination on site.

This project highlights BAUDET’s ability to support international developments with reliable, industrialised solutions perfectly suited to modern student housing.

  • Type de projet : Construction
  • Type de salle de bain : Polyester
  • Nombre de salle de bain : 348

Nos certifications

BAUDET porte une attention toute particulière à concevoir des salles de bain préfabriquées dans le respect des normes de la construction.

 

  • Certifiées par le CSTB, nos salles de bain remplissent toutes les normes et certifications techniques
  • Nos 2 principes constructifs détiennent des FDES (Fiches de Déclaration Environnementale et Sanitaire) certifiant ainsi que nos produits sont durables et limitent l’impact sur l’environnement.

 

douche préfabriquée certifiée - BAUDET
salle de bain industrialisée - BAUDET
Un projet ? A project? ¿Un proyecto?