Off Site Construction - Bathrooms EHPAD

EHPAD CAVAILLON-LAURIS

107 prefabricated bathrooms for a nursing home in Vaucluse

BAUDET Has been choosen to equip the 107 rooms of EHPAD Cavaillon Lauris. This one will be deliver at the end of 2025, begging 2026.

The choosen bathroom is the out of site NORIA bathroom. Flagship model of our polyester range dedicate to health, the NORIA bathroom brilliantly associate accessibility and the respect of the new PMR standards as well as the design with neat lines and finishes.

Discover the NORIA bathroom on video

The dilevery of our prefabricated bathrooms for this project has been planned for February 2024.

Thanks for your trust, it’s always a pleasure and a proud for BAUDET to particiapte to projects concerning health establishments.

  • Type of project : Construction
  • Type of pods : Polyester
  • Architect : Avantpropos architectes & Cabinet Morere
  • Number of pods : 107
  • Project owner : Centre hospitalier de Cavaillon Lauris
  • 2024
  • CAVAILLON LAURIS
  • Health

Our certifications

BAUDET pays particular attention to designing prefabricated bathrooms that comply with construction standards.

 

  • certified by the CSTB, our bathrooms meet all technical standards and certifications
  • our 2 construction principles have FDES (An Environmental and Sanitary Declaration Chart) certifying that our products are sustainable and limit their impact on the environment.

 

Un projet ? A project?