Tramway Hotel

As part of the renovation of the 3-star establishment, the manager wanted to replace all of its bathrooms. 21 BAUDET bathrooms have been installed in the hotel rooms. The choice of model was made on a case-by-case basis depending on the space available in each room of the establishment.
The choice of the prefabricated solution was made naturally. The promise of minimal deconstruction and speed of installation for a resumption of operations as soon as possible seduced the hotel manager. The rooms have not remained unusable for too long and now the bathrooms are also more hygienic and easier to maintain, which makes it possible to satisfy both the hotel manager and the customers.

Type of project :

Renovation

Number of bathrooms :

21

Type of bathroom :

GRENAT, ONDINE, IRIS