The nursing home managers decided to fully renovate and restructure the premises. Part of the existing building was demolished and replaced with a new and larger construction. The customer aimed to reduce works and disturbance for both residents and personnel in the building as far as possible. Opting for “ready-to-install” bathrooms seemed a logical solution for several reasons: the bathrooms were delivered on full trucks, were quick to install at the site, using a crane for the new part of the building, and could be easily connected at the site by one single technician. The project was broken down into two phases.
Construction
Number of bathrooms :
45
AD HOC ARCHITECTURE
Type of bathroom :
ORMANITE
Prime contractor :
AD HOC ARCHITECTURE
Customer :
"Au bon accueil" elderly care home
Contact
Do you have plans in mind ? Do not hesitaste to give us a call or ask for a quote
Snaggings reduced by 80% and resolves the lack of qualified labor
less waste on site, less greenhouse gas emissions
Rue Saint-Fiacre
85640 Mouchamps – France
Phone +33(0)2 51 66 27 85
Fax +33 (0)2 51 66 27 63