Home / Prime contractor
EASIER
WORKSITE MANAGEMENT
Are you still on the lookout for a way to optimise your project management while controlling the carbon impact at worksite ?
The list of preferences and targets gets longer as each project is managed. You need to find the best solutions available on the market in order to meet deadlines and achieve the level of quality expected by the customer, while protecting both resources and those in the immediate environment. Prefabricated bathrooms can help you meet this increasingly-complex
challenge !
DARE TO TAKE THE NEXT STEP !
Are you uncertain whether your project is compatible with a prefabricated bathroom solution ?
Try our quick test to find out : just run through six key questions !
SIMPLIFIED
PROJECT MANAGEMENT
One single contact rather than the usual six different tradesmen involved
A finished product is delivered on-site – cut project time by 30%
Stay on schedule and in control of lead times
Benefit from one single contact for the entire bathroom batch instead of the usual six contacts with a traditional approach
A Baudet Works department dedicated to the smooth handling of the project
A MORE ENVIRONMENTALLY
RESPONSIBLE SOLUTION
Target: Net-zero carbon impact
No waste generated at the site
Streamlined transport = less greenhouse gas emissions
No disturbance caused by works: no noise, no dust, with non-invasive works at an occupied site
GUARANTEED
BATHROOMS
A quality certified solution
Strict inspections before the pod leaves the production plant
CSTB approval
Compliance with the applicable standards
GPA – Completion guarantee
Ten-year warranty
FORGET LABOUR
SHORTAGES
at worksites
90% of the structure is produced at the plant, only a bare minimum number of qualified workers are required
The quality of the structure does not depend on the experience of available workers, it remains constant and unfailing at all times
SIMPLIFIED CLEARING
OF RESERVATIONS
Fewer reservations and less wasted time
Clearing reservations is simplified and faster
Fewer reservations
Residual reservations are minor, and faster to clear than with traditional construction methods
SAFER CONDITIONS
AT THE SITE
Improved working conditions
Quick and easy installation, reducing the risk of accidents at worksite
Less dangerous operations at heights
Regular professional training at the site